Course Catalog // 4.5.4 SF CMM Site Preparation (11170-00-10)
4.5.4 SF CMM Site Preparation (11170-00-10)
This course explains how to prepare the site, and how to un-crate and position the 4.5.4 SF CMM prior to the arrival of the Hexagon Service Engineer for machine calibration.